Wednesday, March 21, 2012

Summary Graded 2

                                                   The Masder Project
 The UAE Established Masdar, Abu Dhabi’s energy company, it coast Dh734.6 Million. Masder Abu Dhabi’s is the first of its kind in the region. There is not a lot of wind in the gulf, but they are working to design special turbine blades to take the benefits of light winds. Masder has been made the first wind farm, Shams1 and Nour1.The two solar plants are 100 megawatt. Masder will produce electricity of 100mw near the Saudi border. When the construction will be done, the wind farm in two years will generate the power. Wind power is more challenging to develop in the GCC than solar power” (Yee, 2011). In the UAE, its limited because the nature of the wind. There a few days the weather becomes windy but not every time.


References
Yee, A. (2011, April 27). Masdar plan for $200m pioneering wind farm - The National. Latest and breaking news | thenational.ae - The National. Retrieved March 6, 2012, from http://www.thenational.ae/business/energy/masdar-plan-for-200m-pioneering-wind-farm

APA formatting by BibMe.org.


Mohamed Salem Almaamari                 
CIQ
H00232682
Words: 134


No comments:

Post a Comment